By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Pew PatriotsPew PatriotsPew Patriots
Notification Show More
Font ResizerAa
  • Home
  • News
  • Tactical
  • Guns and Gear
  • Prepping & Survival
  • Videos
Reading: Obama Center subcontractor files $40M discrimination lawsuit against engineering firm for overruns
Share
Font ResizerAa
Pew PatriotsPew Patriots
  • News
  • Tactical
  • Guns and Gear
  • Prepping & Survival
  • Videos
Search
  • Home
  • News
  • Tactical
  • Guns and Gear
  • Prepping & Survival
  • Videos
Have an existing account? Sign In
Follow US
Obama Center subcontractor files M discrimination lawsuit against engineering firm for overruns
News

Obama Center subcontractor files $40M discrimination lawsuit against engineering firm for overruns

Jimmie Dempsey
Last updated: February 2, 2025 1:24 am
Jimmie Dempsey Published February 2, 2025
Share
SHARE

A Chicago-based subcontractor is suing one of the firms involved in managing the construction of the Obama Presidential Center for $40 million, claiming racial discriminatory practices forced the firm to do extra work that left it at risk of bankruptcy, according to a lawsuit.

Robert McGee, the owner of II in One, which provided concrete and rebar services for the center starting in 2021, filed the lawsuit in federal court last month against New York-based Thornton Tomasetti, which oversees structural engineering and design services for the $830 million project.

McGee claims that Thornton Tomasetti changed standards and imposed new rules around rebar spacing and tolerance requirements that differed from the American Concrete Institute standards, which resulted in “excessively rigorous and unnecessary inspection” and massive overruns.

OBAMA BREAKS GROUND IN CHICAGO FOR MASSIVE PRESIDENTIAL CENTER PROJECT

This, McGee, claims, incurred extensive paperwork that impacted productivity and resulted in millions in losses, according to the lawsuit. 

However, Thornton Tomasetti defended its actions nearly a year ago, writing in a memo to the lawsuit that the subcontractors were “questionably qualified,” and the delays were due to their own shortcomings.

The Obama Presidential Center is being built near Jackson Park in Chicago, and will consist of a planned museum, library, community and conference facilities. The center will house the nonprofit Obama Foundation, which is overseeing the center’s development and operates a scholarship program through the University of Chicago’s Harris School of Public Policy.

McGee claims Thornton Tomasetti falsely accused II in One of lacking sufficient qualifications and experience to perform its work, while stating that non-minority-owned contractors were sufficiently qualified.

He is seeking to be paid back for roughly $40 million in construction costs the firm covered itself along with its joint venture partner, Concrete Collective.

“In a shocking and disheartening turn of events, the African American owner of a local construction company finds himself and his company on the brink of forced closure because of racial discrimination by the structural engineer,” the lawsuit reads. 

Cracking of a slab pour

“II in One and its joint venture partners… was subjected to baseless criticisms and defamatory and discriminatory accusations by the Obama Foundation’s structural engineer, Thornton Tomasetti.

However, Thornton Tomasetti claimed in an attached February 2024 memo that construction costs and delays “were all unequivocally driven by the underperformance and inexperience” of that subcontractor, II in One.

In a memo, Thornton Tomasetti shared images of cracked slab and exposed rebar.

In the memo, Thornton Tomasetti tells Obama Foundation leadership that it spent hundreds of hours reviewing, analyzing, re-designing and responding to corrective work and that contractors caused “a multitude of problems in the field.”

CHICAGO SOUTH SIDE RESIDENTS SAY THEY’RE BEING DISPLACED BY OBAMA CENTER: CAUSING ‘HARM TO BLACK FAMILIES’

Thornton Tomasetti said the challenges with the concrete were due solely to the performance of the contractors.

“We cannot stand by while contractors attempt to blame their own shortcomings on the design team,” the memo states.

The memo goes on to state that Thornton Tomasetti and an architectural firm “bent over backwards to assist what everyone knows was a questionably qualified subcontractor team in areas where more qualified subcontractor would not have required it.”

Obama Presidential Center being built

The project has faced problems in the past. Construction was initially anticipated to get underway in 2018, but it was kicked back to 2021. It is scheduled to open sometime in 2026.

Some community activists claim the new center will cause prices for homes and rent to increase and may price many of those who live in the area. Environmental activists have also been critical of the project, arguing that it would remove too many trees and destroy some bird habitats.

Activists threatened to sue to block developments, but the plan to build the center was approved shortly after a lawsuit was filed, according to Newsweek. The Supreme Court denied the request to hear the case in 2021.

Pritzker and the Obamas

Obama has said he hopes the center would help promote the city’s South Side and bring Chicagoans together.

The Democrat downplayed those controversies during his 2021 groundbreaking speech at the site saying that the center will “plant new trees” and “provide new habitats for birds and wildlife.”

Fox News Digital contacted the Obama Foundation, Thornton Tomasetti and II in One for comment but did not receive responses before publication.

Fox News’ Michael Lew contributed to this report. 

READ THE LAWSUIT: APP USERS CLICK HERE:

Read the full article here

You Might Also Like

Illinois governor says Trump admin withholding $1.88B in approved taxpayer money, amid rift with president

Collin Morikawa’s caddie, JJ Jakovac, nails hole-in-one before start of The Players Championship

Karen Read’s bold media blitz might be working as jury zeroes in on lesser charge: expert

Trump shreds Biden, ‘Radical Left Lunatics’ in Easter message

GOP lawmakers, Riley Gaines slam Democrats for voting against Protection of Women and Girls in Sports Act

Share This Article
Facebook Twitter Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

We Recommend
Retired general tells CNN he’s ‘impressed’ by Trump striking Iran, says American lives potentially saved
News

Retired general tells CNN he’s ‘impressed’ by Trump striking Iran, says American lives potentially saved

Jimmie Dempsey Jimmie Dempsey June 22, 2025
Trump earns bipartisan praise for decisive action against Iran’s nuclear program
How a Papa Johns pizza surge near the Pentagon tipped off social media before Trump’s decisive Iran strike
Misdirection and ‘deception’ likely key in Trump admin’s surprise Iran strike
US strikes 3 Iranian nuclear sites, Trump says
Couple charged in alleged cyanide plot to kill ex-girlfriends; agents hospitalized during search
Los Angeles taxpayers to foot millions for ‘peaceful’ anti-ICE protests
News

Los Angeles taxpayers to foot millions for ‘peaceful’ anti-ICE protests

Jimmie Dempsey Jimmie Dempsey June 22, 2025
Why You’re NOT Safe Without These 15 SURVIVAL Gear & Gadgets?
Videos

Why You’re NOT Safe Without These 15 SURVIVAL Gear & Gadgets?

Survival Gear Survival Gear June 21, 2025
Mega-yacht with 400 passengers crashes into New York City dock, injuring nearly a dozen
News

Mega-yacht with 400 passengers crashes into New York City dock, injuring nearly a dozen

Jimmie Dempsey Jimmie Dempsey June 21, 2025
Pew Patriots
  • News
  • Tactical
  • Prepping & Survival
  • Videos
  • Guns and Gear
2024 © Pew Patriots. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?