By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Pew PatriotsPew PatriotsPew Patriots
Notification Show More
Font ResizerAa
  • Home
  • News
  • Tactical
  • Guns and Gear
  • Prepping & Survival
  • Videos
Reading: Navy cannibalizing materiel for spare parts, watchdog says
Share
Font ResizerAa
Pew PatriotsPew Patriots
  • News
  • Tactical
  • Guns and Gear
  • Prepping & Survival
  • Videos
Search
  • Home
  • News
  • Tactical
  • Guns and Gear
  • Prepping & Survival
  • Videos
Have an existing account? Sign In
Follow US
Navy cannibalizing materiel for spare parts, watchdog says
Tactical

Navy cannibalizing materiel for spare parts, watchdog says

Jimmie Dempsey
Last updated: October 8, 2025 5:47 pm
Jimmie Dempsey Published October 8, 2025
Share
SHARE

The U.S. Navy is scavenging for spare parts from grounded materiel in order to address maintenance needs, a new government watchdog report found.

The problem arises from gaps in the Defense Department’s data rights for weapon systems that force Navy maintainers to rely on vendors for parts, which in turn can balloon maintenance timelines.

In the event of these repair delays, the service maintains operational readiness by repurposing parts from its own aircraft and submarines.

The DOD doesn’t obtain the data rights and intellectual property (IP) from contractors and manufacturers it needs to adequately sustain the weapons systems those contractors produce, the U.S. Government Accountability Office found.

The department also fails to adequately manage the IP it does obtain, which includes engineering drawings and technical manuals, further inhibiting proper repairs, the report said. Program personnel did not complete comprehensive reviews of the data that they received in conjunction with the weapon systems.

The report singled out five major weapon systems with data right issues, including the F/A-18 fighter aircraft, F-35 fighter aircraft, Littoral Combat Ship, Stryker Combat Vehicle and Virginia-class Submarine.

Each program lacked the proper data rights to perform depot-level sustainment — maintenance that typically requires uniquely experienced personnel, according to the report. Programs also faced vendor lock, in which the lack of proper data or the rights to access the proper data forced them to rely on the contractor for help with weapon system sustainment.

But the programs have figured out ways to accomplish their goals in the face of maintenance delays, a lack of spare parts, and ballooning costs for sustainment upkeep.

RELATED

Maintainers for the F/A-18 told the GAO that years spent unsuccessfully attempting to obtain data rights for frequency cables from the prime contractor left them “cannibalizing grounded aircraft for the part.”

Since only the vendor can make the part the maintainers need in this instance, the timeline for repair is dictated by the vendor.

And though the workaround may address sustainment needs, it can lead to its own host of problems.

Ripping parts from grounded aircraft to plug holes in others can lead to an uptick in maintenance costs, workload, and aircraft availability, the report said.

Maintainers for the Virginia-class submarine said they were also forced to cannibalize parts from other submarines due to a reliance on contractors who own technical data rights for necessary components.

The DOD’s license rights to access IP, which is acquired through contracts and weapon system development, are stipulated in statutes and regulations.

But while statutes allow the DOD to access data for operation, maintenance, installation and training purposes, they do not encompass detailed manufacturing or process data.

This leads to miscommunication and or misunderstandings over contract terms and what type of data the DOD is getting, which affects the DOD’s ability to sustain those weapons systems.

The government and contractors may have different interpretations on what data is necessary for system maintenance, the report said.

DOD guidance advises that the department acquire data rights to ensure the systems are sustained, but the guidance focuses on the early stages of the “acquisition cycle” and not on systems that need to be maintained.

Maintainers for Virginia-class submarines, like the USS Iowa, pictured here, say they were forced to cannibalize parts from other submarines because of contract issues with vendors. (John Narewski/U.S. Navy)

The GAO report notes that it’s hard for DOD program offices to accurately predict the entire catalogue of data rights they’ll need in the future for the sustainment of systems.

This can lead to acquiring more data than is necessary, which can skyrocket the cost of programs or scare contractors away from asks they feel are oversized.

On the other end, though, a stunted ask leads to problems with system sustainment later on.

The GAO recommended in its report that Congress stipulate how manufacturing data should be handled between contractors and the DOD.

The watchdog also recommended that the DOD “provide additional IP planning information for programs in sustainment” and revisit the effectiveness of the process in which data deliverables are assessed.

Riley Ceder is a reporter at Military Times, where he covers breaking news, criminal justice, investigations, and cyber. He previously worked as an investigative practicum student at The Washington Post, where he contributed to the Abused by the Badge investigation.

Read the full article here

You Might Also Like

First Look: Reptilia G-Plate Optic For SIG Sauer Romeo X Sights

The Army-Navy game that ‘stopped the war’

Oregon’s New Gun Law Could Put You in Jail for What You Already Own!

Airman ID’d as victim in AK-47 shooting near Wyoming base

First Look: Henry Repeating Arms Mini Bolt Youth G2 Rifle

Share This Article
Facebook Twitter Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

We Recommend
No Deal With Iran! An Apocalyptic “Regime Change War” Appears To Be Imminent
Prepping & Survival

No Deal With Iran! An Apocalyptic “Regime Change War” Appears To Be Imminent

Jimmie Dempsey Jimmie Dempsey January 31, 2026
US military warns Iran it will not tolerate any ‘unsafe’ actions ahead of live-fire drills in Strait of Hormuz
Campus Radicals: Dems target military school, Chicago teachers wreak havoc, college nurse’s viral scandal
Heinkel He 111 — Germany’s Jack of All Trades
Elena Rybakina defeats top-ranked Aryna Sabalenka to win first Australian Open title
IDF says Gaza strikes hit terrorists, weapons facilities after ceasefire breach; hospitals report 30 killed
Hundreds of political prisoners in Venezuela could be released under new amnesty bill
News

Hundreds of political prisoners in Venezuela could be released under new amnesty bill

Jimmie Dempsey Jimmie Dempsey January 31, 2026
From Obama award to Minnesota op: Why Trump tapped Tom Homan for on-the-ground crackdown
News

From Obama award to Minnesota op: Why Trump tapped Tom Homan for on-the-ground crackdown

Jimmie Dempsey Jimmie Dempsey January 31, 2026
Fix is in in Minnesota, where anti-ICE federal judge leaves his lane to side with mob
News

Fix is in in Minnesota, where anti-ICE federal judge leaves his lane to side with mob

Jimmie Dempsey Jimmie Dempsey January 31, 2026
Pew Patriots
  • News
  • Tactical
  • Prepping & Survival
  • Videos
  • Guns and Gear
2024 © Pew Patriots. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?