By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Pew PatriotsPew PatriotsPew Patriots
Notification Show More
Font ResizerAa
  • Home
  • News
  • Tactical
  • Guns and Gear
  • Prepping & Survival
  • Videos
Reading: Army targets 2028 to deliver future assault aircraft to soldiers
Share
Font ResizerAa
Pew PatriotsPew Patriots
  • News
  • Tactical
  • Guns and Gear
  • Prepping & Survival
  • Videos
Search
  • Home
  • News
  • Tactical
  • Guns and Gear
  • Prepping & Survival
  • Videos
Have an existing account? Sign In
Follow US
Army targets 2028 to deliver future assault aircraft to soldiers
Tactical

Army targets 2028 to deliver future assault aircraft to soldiers

Jimmie Dempsey
Last updated: May 16, 2025 9:41 pm
Jimmie Dempsey Published May 16, 2025
Share
SHARE

NASHVILLE, Tenn. − The Army plans to accelerate the delivery of its first production-representative Future Long-Range Assault Aircraft to soldiers in 2028 by moving into low-rate production while still testing prototypes, Col. Jeffrey Poquette, the service’s FLRAA program manager, told Defense News.

Army leadership has tasked itself to accelerate the fielding of FLRAA as part of a newly debuted transformation initiative. And while speeding up any major procurement program contains substantial risk, Army aviation leaders and Textron’s Bell, the company chosen to build the service’s brand new advanced tiltrotor, say the program is unique in the sense that significant risk was driven down through digital design, engineering and a technology demonstration effort, where it flew the V-280 Valor tiltrotor for over 200 hours.

“Normally you would build prototypes, then you would go to test,” Poquette said. “And during test, you’re not doing a whole lot of building. You’re testing the aircraft and you’re building up a body of engineering work and results [ahead of] a Milestone C [production] decision.”

Typically, programs are in testing with prototypes for roughly two years prior to production decisions.

“We’re not going to accelerate testing. We’re not going to accelerate design,” he said. “They’re already very compressed, but what we can do is assume a little bit of risk and say, well maybe we can build aircraft during test.”

With the test effort going on in the background with the eight prototypes that will have already been built, Bell would begin building production aircraft, he said.

In 2027, the Army plans to make an early production decision ahead of Milestone C. The service is able to do so because there is already an option built into the current contract with Bell to exercise a low-rate production lot.

While concurrency — when a program chooses to produce systems before proving final design out through the testing program — has led to program delays and, in some cases, demise, Bell and the Army are confident this time is different.

Bell has assured the Army that it is “very confident” in its digital engineering to the point that, “although it may not be perfect, it’ll be pretty close,” Poquette said.

“It’s a continuation of production from our prototypes into early production representative aircraft,” Ryan Ehinger, Bell’s FLRAA program manager, said. “And it’s a second iteration. We did the [Joint Multirole Technology Demonstrator]. That was a one-off aircraft. We’ve been doing manufacturing development from then through now in some of these advanced manufacturing technologies and techniques.”

Bell also builds critical components like the wing, the blades and the gear boxes, he added.

“We’ve got our manufacturing technology center that has been iterating for years on some of these designs,” he said.

Another lever the Army plans to try to pull to accelerate fielding is completing full-rate production in four or five years rather than in seven or eight.

“What we’re asking Bell to do is build capacity faster to get to a full-rate production,” Poquette said. “That means we get a company a year earlier, but we get a battalion 18 months earlier and we get two battalions 30 months earlier.”

While the original plan was to conduct the initial operational test program in late FY31, the Army could also be able to enter that phase more quickly because it will already have aircraft built, according to Poquette.

The IOT&E could potentially begin in the FY28 or FY29 time period.

Jen Judson is an award-winning journalist covering land warfare for Defense News. She has also worked for Politico and Inside Defense. She holds a Master of Science degree in journalism from Boston University and a Bachelor of Arts degree from Kenyon College.

Read the full article here

You Might Also Like

First Look: Otter Creek Infinity 7.62 Suppressor

Navy, Air Force cleared to fly Ospreys after inspecting gears

5 Best Double Stack 1911 Pistols Of SHOT Show 2025

USS Carl Vinson in Mideast ahead of Iran-US nuclear talks

VA leaders working with DOGE but say veterans’ personal info is secure

Share This Article
Facebook Twitter Email Print
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

We Recommend
Former Falcons star Tim Green ‘proud’ of Shedeur Sanders’ positivity after his NFL Draft free fall
News

Former Falcons star Tim Green ‘proud’ of Shedeur Sanders’ positivity after his NFL Draft free fall

Jimmie Dempsey Jimmie Dempsey June 14, 2025
Dodgers pitcher Clayton Kershaw displays Bible passage on hat during Pride Night
Over 200 Israeli Warplanes Used Against Iran, Trump Warns ‘More Brutal’ Attacks Coming Without Nuclear Deal
Guardians pitcher narrowly escapes serious injury after 106.6 mph line drive comes right toward his head
Reds’ Wade Miley responds after being identified as alleged drug supplier to late Tyler Skaggs
First Look: Safariland Gravity Holster
David, Victoria Beckham officially become ‘Sir’ and ‘Lady’ as King Charles III bestows knighthood
News

David, Victoria Beckham officially become ‘Sir’ and ‘Lady’ as King Charles III bestows knighthood

Jimmie Dempsey Jimmie Dempsey June 14, 2025
Marines temporarily detain man while guarding LA federal building
Tactical

Marines temporarily detain man while guarding LA federal building

Jimmie Dempsey Jimmie Dempsey June 14, 2025
Douglas A-26 Invader: The Modular Attack Plane
Guns and Gear

Douglas A-26 Invader: The Modular Attack Plane

Jimmie Dempsey Jimmie Dempsey June 14, 2025
Pew Patriots
  • News
  • Tactical
  • Prepping & Survival
  • Videos
  • Guns and Gear
2024 © Pew Patriots. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?